Study and design for the final design of 13 bridges
ITACOL consortium (Anas leader with 66%) was granted the contract, having obtained the maximum score both for the economic and for the technical proposal. The contract foresees the final design of 13 new bridges in four different regions of Colombia to replace the existing connections heavily damaged by the Nina in winter 2010-2011.
LA BATATALERA Bridge (Boyaca)
LA PALMERA Bridge (Santander - Boyaca)
CAMARA